The House

Interior Trim Work

The interior of the house is going pretty well. It’s slow because of all the detail but it is looking exactly like we want it. Ed built a set of drying racks for me to use for painting all the trim pieces so I don’t have to find places to set them while they dry. It has been a God send. We had some 6×4 posts that we weren’t using and he set them into a particle board stand and drilled holes in each side.


We had some metal rods left over from pouring our foundation walls that we use as the shelf cleats. Works great.

Just because we needed to see some progress, Ed has finished the crown mold in all the rooms. We have it all throughout the house.



We have also put up some medallions around the light fixtures in the Library, Parlor, Front Halls, and Dining Room. Very cool.